1.      EU / Worldbank Projects

Project

Short description

Execution time

Client

 

Integrated Waste Management System in Teleorman County, Romania

 

ISPA Project, EU financed
Team Leader of an international Consortium for the design of a new waste disposal facility and shut down of old dump sites

 

2005

 

Fichtner Gmbh & Co. KG, Stuttgart, Germany

 

 

Detailed Design, Tender Documents and Technical Assistance for Regional Waste Management Center, Kardjali, Bulgaria

 

ISPA Project, EU financed
Team Leader of an international Consortium for the design of a new waste disposal facility, 8 transfer loading stations and shut down of 8 old dump sites

 

2006 - in progress

 

NIRAS, Chemcontrol,
Odense, Denmark

2.      Construction quality control

Project

Short description

Execution time

Client

 

 

Central landfill Mechernich

 

Section III, base sealing, mineral and geomembrane liner

 

1991 - 1992

 

County of Euskirchen 

 

 

Central landfill Mechernich

 

Section VII, base sealing, mineral and geomembrane liner

 

1993 - 1996

 

 

County of Euskirchen 

 

 

Central landfill Bochum Kornharpen

 

West extension, polymeric improved base liner

 

1993 - 1999

 

 

City of Bochum 

 

 

Landfill Muertendall,
Luxembourg

 

Base sealing, geomembrane liner

 

1995 – 1998

 

SIGRE, Luxembourg

 

Landfill Fridhaff,
Luxembourg

 

Base sealing, geomembrane liner, HDPE coating of the leachate reservoir

 

1998 – 1999

 

SIDEC, Luxembourg

 

Dam “Genkeltalsperre”

 

Renovation of the dam using asphalt liner

 

1999

 

Aggerverband

 

Dump Dhünnaue-Mitte 

 

280.000 m² surface sealing, mineral and geomembrane liner

 

1995 - 2000

 

City of Leverkusen/ Bayer AG

 

Landfill Klein-
leifringhausen

 

Mineral surface sealing

 

2000

 

AMK

 

Dam “Obere Herbringhauser Talsperre”

 

Renovation of the dam using the „Carpi-System“ (combinated geomenbrane)

 

2000 – 2003

 

State Environmental Agency Düsseldorf / Stadtwerke Wuppertal

 

Waste utilization Center Barum

 

Surface sealing, geomembrane liner

 

2000 – 2001

 

NILEG / Salzgitter AG

 

Composting plant Angelsberg, Luxembourg

 

Leachate drainage system

 

2001

 

SIDEC, Luxembourg

 

Composting plant Itzig, Luxembourg

 

Leachate drainage system

 

2001 – 2002

 

Town of Hesperingen, Luxembourg

 

Landfill Klein
-leifringhausen

 

Section III, base sealing, mineral and geomembrane liner

 

2001 –2002

 

AMK

 

Landfill Flechum

 

Surface sealing, geomembrane liner and capillary block

 

2002 –2004

 

ALE

 

Landfill Fridhaff, Luxembourg

 

Intermediate sealing, asphalt liner

 

2002 –2004

 

SIDEC, Luxembourg

 

Landfill Fridhaff, Luxembourg

 

Remediation of a leachate reservoir

 

2002 – 2003

 

SIDEC, Luxembourg

 

Biomass plant
Niederpallen,
Luxembourg

 

Gas extraction system

 

2003

 

Copropriété
„Biogas un der Atert“, Luxembourg
 

 

Landfill Muertendall, Luxembourg

 

Maintenance and control works

 

2004 – 2005

 

SIGRE, Luxembourg

3.      Site supervision  

Project

Short description

Execution time

Client

 

 

Landfill Müschede

 

Landfill gas extraction and utilization system

 

1991 – 1994

 

County of Hochsauerland

 

Landfill Huckarde

 

Landfill gas extraction system

 

1993 – 1994

 

Entsorgung Dortmund GmbH

 

Landfill Kornharpen

 

Landfill gas extraction system

 

1994 – 1996

 

Stadtwerke Bochum GmbH

 

Commercial destrict M1 Essen

 

Demolition and remediation

 

1995 – 1999

 

PROESS

 

Commercial destrict Duisburg
Stepelsche Straße

 

Remediation of a contaminated industrial area

 

1997 – 1998

 

LEG NRW

 

Textile factory Girmes

 

Demolition

 

1998 – 1999

 

LEG NRW

 

Landfill
Al Multaqaa
Muscat, Oman

 

Construction of new dumping yard for solid waste incl. entrance area and leachate treatment

 

2004 – 2005

 

Fichtner, Stuttgart/
Muscat Municipality

4.      Planning

Project

Short description

Execution time

Customer

 

Landfill Industriestraße

 

Design and technical specifications of a new landfill for mineral waste

 

1991 - 1993

 

City of Velbert

 

 

Mono landfill Wislade

 

Design of a new landfill for sanitary sludge

 

1991 - 1995

 

Ruhrverband,
Plettenberg
 

 

Landfill
Kornharpen

 

Study, design and technical specifications of the gas extraction system (3.000 m³/h) (wells, pipelines, compressor plant)

 

1991 - 1996

 

 

Stadtwerke Bochum

 

Landfill Rheinhausen

 

Design of a new landfill for contaminated mineral waste

 

1992

 

Krupp Stahl AG,
Rheinhausen
 


 

Mono landfill Buchenhofen

 

Study and design of a new landfill for filter ashes of a sanitary sludge incinerator

 

1992 - 1996

 

 

Wupperverband,
Wuppertal

 

Hazardous waste landfill Röthehof

 

Design of remediation

 

1993 - 1997

 

MEAB GmbH,
 Neufahrland
 

 

Steel factory Westhofen

 

Design of remediation of a contaminated area

 

1993

 

Waggonbau Brüninghaus

 

Landfill
Müschede

 

Study, design and technical specifications of the gas extraction system (wells, pipelines, compressor plant, power plant)

 

1993 - 1994

 

County of Hochsauerland

 

Landfill
Huckarde

 

Study, design and technical specifications of the gas extraction system (wells, pipelines)

 

1993 - 1995

 

DEGAS Deponiegas-
gewinnungs
GmbH& Co. KG, Essen
 

 

Landfill Müschede

 

Design of an irrigation plant using leachate

 

1993 - 1996

 

County of Hochsauerland

 

Hallembaye Landfill, Belgium

 

Design and technical specifications of a landfill gas utilization plant

 

1996 - 1997

 

Tractebel Engineering, Namur, Belgium

 

Dust protection dam Weisweiler

 

Design of a dust protection dam constructed with foundry cinder

 

2001 – 2002

 

Elektrowerk Weisweiler

 5.      Consulting

 

Short description

Execution time

Client

 

Waste management, Coyhaique, Chile

 

Consulting for the remediation of 3 old dump sites, the construction of a new landfill including the logistics for the waste collection and transport

 

1998

 

Poch & Bresh, Santiago de Chile

 

 

Waste management, Santiago de Chile

 

Consulting for the construction of new compost plants in the City of Santiago

 

1999

 

Poch & Bresh, Santiago de Chile

 

 

Waste water treatment plant, Agrosuper Ltda., Chile

 

Consulting and predesign of a waste water treatment plant for a cattle breeding

 

2000

 

 

Poch & Bresh, Santiago de Chile

 

Cogeneration plant, Santiago de Chile

 

Consulting and feasibility study for wood gasification plant for generation of electricity and heat for the production of bricks

 

2001

 

Ceramicas
Santiago S.A.,Chile

 