Landfill Al Multaqaa, Al Amerat, Muscat, Sultanate of Oman
|
|
 |
 |
|
 |
|
 |
|
 |
|
|
|
 |
|
|
|
|
|
|
Construction of a new landfill for Muscat, the capital of Oman
Construction of a leachate treatment plant
Construction of the landfill gas collection pipes and gas collection substations for the horizontal and vertical gas extraction system
Construction of a receiving area with staff facility building, workshop, garage and weighing facility
Scope of work: Consultant, site supervision; Resident engineer for Fichtner Muscat
|
|
 |
|
|
|
Client:
|
Muscat Municipality, Muscat, Sultanate of Oman
|
|
Projectmanagement:
|
Fichtner GmbH & Co. KG, Germany
|
|
Design:
|
ICP GmbH, Germany
|
|
Contractor:
|
STRABAG Oman LLC
|
|
 |
|
|
|
Deposit area, total:
|
466.500 m²
|
|
|
78.000 m²
|
|
Deposit volume:
|
1.275.000 m³
|
|
Leachate treatment:
|
Evaporation Pond
|
|
Sealing systems:
|
|
|
|
Asphaltconcrete, 2 liner, wearing course 8 cm, sealing course 6 cm
|
|
|
HDPE liner, 2,5 mm, 2 liner, leckage control
|
|
|